Saturday, October 6, 2012

All finished!

Amazingly enough, we finished. The bathroom and bedroom, minus just a couple of punch list items, and a final inspection, are ready for Justin to move in.

Friday had the now usual assortment of all kinds of tasks: connecting the sink faucet and drain, installing the toilet, completing the shower hookup, assembling the ceiling fan (nice breeze!), laying the bedroom floor, running baseboard, running the extra molding on the baseboard we realized we needed after running the baseboard, actually turning on the water (with no small amount of trepidation), mounting the grab rails, and of course, lots of painting and touch ups.

At the end of the day, we had a formal dedication ceremony. Lots of the local Fuller folks and Justin's extended family came. The church's minister said a few words, and Merle (Neil's wife - the President of the NJ Pines Fuller affiliate) presented the (symbolic) keys and a Bible, and led us in the Fuller Center traditional "Oyez!".

Everyone gathered for the dedication




The finished product

From the kitchen, looking into the bedroom - you can see the bathroom door on the left


The  bedroom from the kitchen door


The wall-mounted sink with the wall tile


The shower


No comments:

Post a Comment